| Work Type: | photography | | Date of work: | 1922-23 | | Materials: | medium: gelatin-silver print notes: framed
| | Inscriptions: |
text: (A) Rear of shield North Tunnel - New York: Turnbuckles, etc. Injury to Inspector Blakeslee 1-31-23 4-00 P.M.' (verso)
text type:
signature
text: (B) Canal Street Shield - New York 9.29.22 10.00 a.m. View looking down Canal Street Shaft, New York City, showing progress in erection of shield. Camera set in prone position on an overhanging platform …' (verso)
text type:
signature
text: (C) 3 Working chamber of North Land Shaft Caisson, New Jersey 1.31.23 W.30 A.M.: View of silt in working chamber when it is about 75% mucked out ready for a drop.' (verso)
text type:
signature
| | Measurements: | height: 23.5 cm extent: image size
width: 18.5 cm extent: image size notes: each
height: 112 cm extent: framed size
width: 47 cm extent: framed size
depth: 3.2 cm extent: framed size
| | Subject: | New York, construction, worker | | Technique: | photography | | Collection: | One Hundred Photographs
| | | Description: | Photographs of heavy road construction in Manhattan. | |
| |